Plan by asset
Tie every recurring task to the equipment, frequency, first due date and expected effort.
Schedule preventive maintenance against assets, assign owners or teams, attach controlled job sheets and retain the completed work in the asset lifecycle.
Schedule by date, meter reading, runtime or cycles. Reuse PM job sheets, see overdue work and retain completion records against the asset.

A connected schedule creates visible work, standardises execution and keeps completion evidence with the equipment it protects.
Tie every recurring task to the equipment, frequency, first due date and expected effort.
Attach preparation, method, acceptance criteria and technician response fields.
Assign a user or team and expose upcoming work through dashboards and calendar views.
Keep completed planned work, parts, downtime and sign-off on the asset record.
Configure the recurring requirement once, then give technicians a clear work order and job sheet when it becomes due.

Define the maintained asset, task, timing, owner and expected effort in one structured schedule.

Give the generated task a clear asset, discipline, priority and responsible team before it reaches the schedule.

View planned events by month or week so maintenance and compliance obligations can be coordinated.
Each capability contributes to the same connected asset and compliance record.
Create calendar, meter, runtime or production-cycle schedules to match the maintenance strategy.
Record preparation, work method, acceptance criteria and a controlled job sheet.
Use a shared library or build a one-off checklist for a particular asset schedule.
Generate a work order with status, assignees, participants, parts, downtime and sign-off.
Require applicable safety checks before physical work can begin.
See upcoming maintenance with compliance events and review work-order trends over time.
Choose the asset, frequency, first due date and owner.
Attach the procedure and technician-ready job sheet.
Complete the generated work order, checks and required responses.
Review history, downtime and trends, then adjust the maintenance strategy.
Yes. Teams can maintain reusable PM job sheets or create a one-off checklist that belongs only to a specific asset schedule.
Yes. A schedule can be owned by a person or team, and generated work remains visible through the operational dashboard and work-order views.
Yes. Applicable inspections can be required before a work order starts, with database-enforced blocking for unresolved safety-critical results.
Start free with 20 assets, 1 manager and 5 operational users. No expiry and no card required.
Create your workspace