LOLER

Keep thorough examinations visible, prepared and completed before expiry.

Coordinate equipment access, competent persons, certificates, configurations and defect follow-up across the lifting-equipment register.

8 minute readReviewed September 2026
THE SHORT ANSWER

LOLER due-date management starts with an accurate register and the examination interval or written scheme applicable to each item and accessory.

Understanding managing loler due dates

Forecast work early enough to arrange access, clean equipment, provide history and minimise disruption without exceeding the required date.

Keep routine checks, maintenance and statutory thorough examination distinct while coordinating their findings around the same lifting equipment.

A practical approach

Escalate upcoming and overdue items by risk. Do not silently move dates or assume an appointment extends validity.

Define responsibility, applicable criteria and escalation before collecting more data.

  • Forward due-date visibility
  • Examination-scheme control
  • Competent-person coordination
  • Overdue escalation

Evidence and continual control

After examination, review the report, update the next date and route defects while retaining the previous requirement and evidence.

Review exceptions and outcomes regularly so the process improves rather than becoming static administration.

Authoritative guidance

Use these primary sources alongside your organisation's competent technical and legal advice.

COMMON QUESTIONS

Managing LOLER due dates FAQs

Why does managing loler due dates matter?

LOLER due-date management starts with an accurate register and the examination interval or written scheme applicable to each item and accessory.

What should an organisation document?

After examination, review the report, update the next date and route defects while retaining the previous requirement and evidence.

Can software replace competent judgement?

No. Software can organise workflow and evidence, but technical, legal and safety decisions remain with competent and authorised people.

KEEP READING

Strengthen risk and inspection control

LOLER inspection softwareManage equipment identity, examination schemes, competent-person reports and follow-up without losing the distinction between maintenance and thorough examination.What is LOLER?Learn about strength and stability, positioning, marking, planning, thorough examination and reporting of defects.LOLER inspection checklistCover equipment identity, marking, documents, due dates, defects and operational controls around lifting equipment.LOLER inspection frequencyLearn why six- and twelve-month intervals are common, when a written scheme applies and which events trigger additional examination.Equipment covered by LOLERUnderstand why classification depends on function and use, and how equipment can be subject to both LOLER and PUWER.LOLER thorough examinationLearn how thorough examination differs from routine maintenance and what the competent person's report should trigger.
PUT THE GUIDANCE INTO PRACTICE

Connect inspections, risk and corrective work.

Maintarium Pro connects controlled inspections and risk records with equipment status and accountable action.

Create your workspace

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.